Maintenance tips for industrial chiller water towers
来源: | Author:AUWII | Time:2020-12-16 | 1168 Access | 分享到:
First of all, after the stainless steel water tower is used, the components such as the hose should be cleaned first. Pay special attention to remove the grease on the pump and the soil in the concave part of the liquid tank.

How to maintain the water tower of the industrial chiller? What are the tips for maintenance?

First of all, after the stainless steel water tower is used, the components such as the hose should be cleaned first. Pay special attention to remove the grease on the pump and the soil in the concave part of the liquid tank. Especially after spraying a highly corrosive pesticide such as Bordeaux mixture, it is best to soak it in alkaline water for 1-2 hours. Be careful to prevent rust. All parts that can be removed must be removed and cleaned. The inner wall of the spray bar and the spray head should be smeared with oil to protect it from rust.

Next, check each connection for leaks. When using, first install the water pipe to try and then install other things. When adding water, first ensure that the stainless steel water tower is unobstructed, and the liquid level cannot exceed the safe water level line. Before use, open the water tower in advance, so that the air pressure in the barrel rises to the working pressure to ensure smooth water flow.

Finally, the core components of electric sprayers are pumps and batteries. Although there are several kinds of pumps on the market, these pumps are afraid of blockage. Therefore, it is necessary to use clean water to rush the medicine. When adding water, it must be filtered with a small filter to prevent clogging.

If the sprayer is not used for a short period of time, the main parts should be cleaned, wiped dry, and stored in a cool dry place. If it is not used for a long time, apply grease to each metal part to prevent rust.

After the water-cooled screw chiller is deactivated, there should be no water in the water tower, which may cause some water pipes to clog, or it may not be smooth when the next use, so it is used once every one or two months.